Owner Jim Wright (left) and Project Manager Ron Englund (right) preparing to rivet the firewall assembly. rt-02.jpg (32301 bytes)
Ron Englund (above) and Dave Payne (below) installing firewall.. rt-03.jpg (37538 bytes)
Ron Englund installing fuselage fuel tank cover.

rt-04.jpg (24546 bytes)

Al Sherman preparing to lower The Racer onto its gear for the first time.

rt-05.jpg (14265 bytes)

Mike Mann covering control surfaces. Rib stitching is on 1/2" spacing per the original

rt-06.jpg (19189 bytes)

 

Home